Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and car operation



Toyota 4Раннер
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Systems of heating, ventilation
- 5. Fuel and exhaust systems
   5.1. Specifications
   5.2. Order of a decompression of fuel system
   + 5.3. Fuel pump and pressure of fuel
   5.4. Hoses and connections
   5.5. Fuel tank
   5.6. Fuel pump
   5.7. Fuel level sensor
   5.8. Air filter
   5.9. Butterfly valve cable
   + 5.10. System of electronic injection of fuel (EFI system)
   - 5.11. Units of system of injection of fuel
      5.11.1. Butterfly valve case
      5.11.2. Regulator of pressure of fuel
      5.11.3. Idling regulator (IAC valve)
      5.11.4. Fuel and nozzle distributor
      5.11.5. Leveling chamber
   5.12. Service of an exhaust system
   + 5.13. System of decrease in toxicity of exhaust gases
+ 6. Transmissions
+ 7. Transmission elements
+ 8. Brake system
+ 9. Suspension bracket and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electroschemes


Рецепты бойлов на карася для успешной рыбалки


5.11.5. Leveling chamber

GENERAL INFORMATION

Leveling chamber and adjacent details (4-cylinder engines)

1. Retsirkulyatsiya tube
2. Leveling chamber
3, 13. Laying
4. Gasoline pipe line
5. Comb
6. Sealant
7, 17. Ring
8. Nozzle
9. Insulator
10. Collector
11. Rack

12. Return gasoline pipe line
14. Converter
15. Forward exhaust pipe
16. Hook
18. Branch pipe of a masloukazatel
19. Final branch pipe
20. Thermal screen
21. Collector final
22. Tire of connection with weight
23. Conducting arm
24. Back cover

Leveling chamber and adjacent details (engines of V6 3,4 l)

1. Sensor of speed of a stream, resonator and air filter
2. Socket of a measuring instrument of speed of a stream
3. Leveling chamber
4. A tank hose with an absorber
5. Retsirkulyatsiya tube
6. Laying
7. Hose of the amplifier of brakes
8. Gasoline pipe line
9. Rack
10. Ring
11. For and/m with automatic transmission
12. A branch pipe for liquid filling
13. Collar of a cable of a butterfly valve
14. Plait
15. A soaking-up collector
16. Air hose
17. Power steering hose

Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Disconnect sockets from the valve of a retsirkulyatsiya, a regulator of idling, the sensor of a zaslonka and the tank valve with an absorber.
3. Disconnect from the case of a zaslonka of draft and cables.
4. Disconnect a retsirkulyatsiya tube from the valve.
5. Designate and disconnect all vacuum hoses.
6. Disconnect from the chamber a hose of ventilation of a case.
7. Remove the tire connecting to weight.
8. Disconnect and muffle cooling hoses from the zaslonka case.
9. Unscrew bolts and remove the chamber assembled with the zaslonka case.
10. Clear the demountable planes, establish new laying and the leveling chamber. Further assembly is carried out upside-down.