Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and car operation



Toyota 4Раннер
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   - 3.1. 4-cylinder engines
      3.1.1. Specifications
      3.1.2. Types of repair, выполняемыe without removal of the engine from the car
      3.1.3. Installation of the piston of the 1st cylinder in VMT of a step of compression
      3.1.4. Cover of a head of cylinders
      3.1.5. A soaking-up collector
      3.1.6. Final collector
      3.1.7. Cam-shafts and pushers
      3.1.8. Head of cylinders
      3.1.9. Cover of a chain drive of cam-shafts
      3.1.10. Forward epiploon of the crankshaft
      3.1.11. Oil pallet
      3.1.12. Oil pump
      3.1.13. Flywheel (a leading disk of the hydrotransformer)
      3.1.14. Back epiploon of the crankshaft
      3.1.15. Engine mount details
   + 3.2. Engines of V6 3,0 l (1993-1994) and 3,4 l (since 1995)
   + 3.3. Dismantle and major maintenance of the engine
+ 4. Systems of heating, ventilation
+ 5. Fuel and exhaust systems
+ 6. Transmissions
+ 7. Transmission elements
+ 8. Brake system
+ 9. Suspension bracket and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electroschemes


Корисні властивості родзинок


3.1.6. Final collector

GENERAL INFORMATION

Prevention

Works are carried out on the cold engine.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. On the engines equipped with PAIR system (pulse system of injection of fuel) remove system of tubes and the valves close to a collector.
3. Turn off bolts (are specified by shooters) and remove thermal screens.
4. Moisten nuts and bolts of a final collector and a nut of fastening of an exhaust pipe to a collector with getting liquid. After wetting unscrew nuts of fastening of an exhaust pipe (see subsection 5.12).
5. Unscrew nuts and fastening bolts (are specified by shooters) and remove a collector and laying.
6. Clear the demountable planes of a collector and a head of cylinders of the remains of a material of laying and deposit deposits. If leak signs through laying are observed, check deformation of the demountable plane of a collector in a specialized workshop, if necessary прошлифуйте.
7. Dress on hairpins of a head of cylinders new laying.

Prevention

Labels on laying should be turned aside from a head of cylinders.


8. Establish a collector and wrap bolts and nuts on former places.
9. Tighten nuts and bolts in three-four receptions with the set moment (it is specified in subsection 3.1.1). Tighten bolts and nuts from the center to the collector periphery.
10. Establish other details as it should be, the return to dismantling.

11. Start the engine and check tightness of connections of a final collector.